Below is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.
FCC Form 824 is a form used by telecommunications carriers to report cable television subscribership data to the Federal Communications Commission (FCC). The form collects information about the number of cable subscribers and their demographic characteristics, including race, ethnicity, and gender, in a given area. This data helps the FCC assess the impact of cable television on different communities and ensure compliance with regulations.
Who is required to file fcc form 824?
FCC Form 824, also known as the Universal Emergency Number Identification (UNI) Reporting Form, is required to be filed by telecommunications carriers. Specifically, carriers that provide interconnected Voice over Internet Protocol (VoIP) services are required to file FCC Form 824.
How to fill out fcc form 824?
To fill out FCC Form 824, also known as the Universal Licensing System (ULS) Application for Antenna Structure Registration (ASR), follow these steps:
1. Visit the FCC's ULS website: Go to the FCC's ULS website at https://wireless.fcc.gov/uls/ and create an FCC username and password if you do not have one already.
2. Log in to your FCC ULS account: Once you have a username and password, log in to your FCC ULS account using the provided credentials.
3. Select the "ASR" option: On the ULS homepage, select the "ASR" option from the available options.
4. Start New ASR Application: After selecting the "ASR" option, click on "Start New ASR Application" to begin the form-filling process.
5. Provide General Information: Provide the necessary general information about the owner, structure, and purpose of the antenna structure. This includes details such as the name and address of the owner, a description of the structure, and the purpose of the antenna.
6. Complete the Environmental Review: Answer the questions related to the environmental review process, including whether the structure is on tribal lands, a floodplain, or if any state or local authorities have denied or objected to the construction of the structure.
7. Fill out Location Information: Provide the precise latitude and longitude of the structure, as well as the structure's altitude above ground level.
8. Include Elevation Structure Details: Provide information about the elevation structure and lighting, including whether it requires any marking and/or lighting, the type of lighting proposed (if applicable), and the source of power for the lighting.
9. Provide Ownership Details: Enter information about the ownership and control of the structure, including details about the entity responsible for its operation and maintenance.
10. Submit Form: Review the completed form for accuracy and completeness before submitting it. Once reviewed, submit the form electronically through the ULS system.
11. Pay Application Fee: After submitting the form, pay the required application fee using the specified payment methods. The fee can be paid online using a credit card or electronic funds transfer.
Note: It is crucial to review the FCC's instructions and guidelines before filling out FCC Form 824 to ensure compliance and accuracy. The instructions can be found on the FCC's website alongside the online form.
What is the purpose of fcc form 824?
The purpose of FCC Form 824 is to register and track the use of frequency assignments for private land mobile radio systems. It is used by licensees to request and update Frequency Coordination or Registration records with the Federal Communications Commission (FCC). This form helps to ensure efficient and interference-free communication between different radio systems operating in close proximity.
What information must be reported on fcc form 824?
The FCC Form 824, also known as the Application for Partial Assignment of Authorization and Application for Consent to Transfer Control of Corporation Holding Broadcast Station Construction Permit or License, requires the following information to be reported:
1. Contact Information: The name, address, telephone numbers, and email address of the applicant and any authorized representatives.
2. Station Information: The call sign, facility ID, and location of the station for which the partial assignment or transfer of control is requested.
3. Parties Involved: The name, address, and contact information of the assignor (current licensee or permit holder), the assignee (proposed licensee or permit holder) and any other parties involved in the transaction. This includes individuals or corporations.
4. Legal Status: The legal status of both the assignor and the assignee, such as whether they are individuals, partnerships, corporations, or other legal entities.
5. Assignor-Assignee Relationship: Details about the relationship between the assignor and the assignee, including any familial or ownership ties, lease agreements, or other relevant information.
6. Proposed Partial Assignment or Transfer: A description of the proposed partial assignment or transfer of control, including the specific actions to be taken, the effective date, and any changes to ownership or control.
7. Construction Permit/License Information: The construction permit or license number, issue date, expiration date, and any other relevant details.
8. Public Interest Statement: A statement explaining how the proposed partial assignment or transfer of control serves the public interest, and any positive or negative effects on competition, diversity, or localism.
9. Certification Statements: Various certifications required by the FCC to ensure compliance with rules and regulations.
10. Exhibits and Attachments: Any additional documents or exhibits required to support the application, such as contracts, financial statements, or other relevant materials.
It's important to note that this information may vary and additional details may be required based on the specific circumstances of the assignment or transfer of control being requested. The FCC provides detailed instructions and guidance for completing Form 824 on its official website.
What is the penalty for the late filing of fcc form 824?
The FCC Form 824, also known as the Universal Service Change Form, is typically used for reporting changes in entity information such as contact details or company structure. It is important to note that the FCC's penalty policy is subject to change, so it is advisable to consult the official FCC website for the most up-to-date information.
As of September 2021, the FCC has not explicitly stated penalties for the late filing of Form 824 on its website. However, it is possible that late or incomplete forms may result in processing delays or the rejection of the submitted information. Additionally, repeated non-compliance with FCC requirements may lead to more severe penalties or enforcement actions.
To avoid any potential penalties or complications, it is recommended to file the FCC Form 824 within the specified deadline or seek guidance from the FCC or a legal professional if you anticipate difficulty meeting the deadline.
How can I edit form824 astrillya onlin apply from Google Drive?
Using pdfFiller with Google Docs allows you to create, amend, and sign documents straight from your Google Drive. The add-on turns your fcc form 824 into a dynamic fillable form that you can manage and eSign from anywhere.
How do I make edits in fcc form824 without leaving Chrome?
Install the pdfFiller Google Chrome Extension in your web browser to begin editing form824 astrillya onlin apply and other documents right from a Google search page. When you examine your documents in Chrome, you may make changes to them. With pdfFiller, you can create fillable documents and update existing PDFs from any internet-connected device.
How do I complete fcc form 824 on an Android device?
On Android, use the pdfFiller mobile app to finish your fcc form824. Adding, editing, deleting text, signing, annotating, and more are all available with the app. All you need is a smartphone and internet.